Skip to main content

BS 855:1990

Current Date published:

Specification for welded steel boilers for central heating and indirect hot water supply (rated output 44 kW to 3 MW)

Requirements for the design and construction including materials, workmanship, inspection, testing and marking of boilers for use with solid, gaseous and liquid fuels.

Get this standard Prices exclude GST
PDF ( Single user document)
$640.87 NZD
HardCopy
$688.70 NZD
Preview only close
Prev {{ page }}/ {{ numPages }} Next
Preview only close
Prev {{ page }}/ {{ numPages }} Next
Pages: 92

Previous versions

Related Information

Similar Standards

  • AS/NZS 4234 Sup 1:2021

    Heated water systems - Calculation of energy consumption-Parameters and outcomes for software simulations (Supplement to AS/NZS 4234:2021)

  • AS/NZS 4234:2021

    Heated water systems - Calculation of energy consumption

  • AS/NZS 4692.1:2005

    Electric water heaters - Energy consumption, performance and general requirements

  • AS/NZS 4692.1:2005 A1


    Electric water heaters - Energy consumption, performance and general requirements: Amendment 1

Preview only close
Prev {{ page }}/ {{ numPages }} Next
Preview only close
Prev {{ page }}/ {{ numPages }} Next
Pages: 92

Previous versions

BS 855:1990

Get this standard Prices exclude GST
PDF ( Single user document)
$640.87 NZD
HardCopy
$688.70 NZD

Request to add this standard to your subscription

BS 855:1990

Price varies
Online library subscription

Your organisation’s Account Administrator must approve a request to add a standard to your subscription.

You may add a comment to the administrator below.

Cancel