Guide to hazardous paint management - Part 1: Lead and other hazardous metallic pigments in industrial applications
Provides guidance on the successful management of the disturbance or removal of paints containing lead and other hazardous metallic pigments used on industrial steel structures. The scope of this Standard also includes other toxic metallic compounds (e.g. zinc chromate, arsenic and cadmium) that have at times been used in paints. Although the controls for most of these other toxicants are similar to those used to manage lead in paint, there are specific differences in toxicology and environmental impact that may require modifications to the general procedures of this Standard.
AS/NZS 4361.1:2017 GUIDE TO HAZARDOUS PAINT MANAGEMENT - LEAD AND OTHER HAZARDOUS METALLIC PIGMENTS IN INDUSTRIAL...
PREFACE
CONTENTS
FOREWORD
1 SCOPE
2 APPLICATION
3 REFERENCED DOCUMENTS
4 DEFINITIONS
4.1 Chain-of-custody form
4.2 Comparable area
4.3 Competent person
4.4 Compliance report
4.5 Containment system
4.6 Contractor
4.7 Discharge
4.8 Disposal
4.9 Hazardous paint
4.10 Hazardous paint compliance plan (HPCP)
4.11 Hazardous waste
4.12 HEPA vacuum
4.13 High efficiency particulate air filter
4.14 Impermeable
4.15 Industrial structure
4.16 Overcoat
4.17 Owner
4.18 PCBU
4.19 Registered medical practitioner
4.20 Regulated area
4.21 Representative sample
4.22 Responsible person
4.23 Small project
4.24 Temporary storage
4.25 Time-weighted average (TWA)
4.26 Total suspended particulate (TSP)
4.27 Toxicity characteristic leaching procedure (TCLP)
4.28 Treatment
4.29 Ventilation system
4.30 Waste Generator
4.31 Worker
4.32 Workplace exposure (to air-borne contaminants)
4.33 Workplace exposure action level
4.34 Workplace exposure standard
5 SMALL PROJECTS
6 DECISION PATH
6.1 General
6.2 Steps in the decision path
7 STEP 1: IDENTIFYING HAZARDOUS METALLIC PIGMENT
8 STEP 2: DETERMINING THE TOTAL MASS OF HAZARDOUS PAINT
9 STEP 3: RISK ASSESSMENT
10 STEP 4: MAINTENANCE PAINTING STRATEGY
10.1 Painting strategy alternatives
10.2 Paint condition assessment
10.3 Other factors
10.4 Reassessment
11 STEP 5: PAINT REMOVAL/SURFACE PREPARATION METHODOLOGY
11.1 Paint removal
11.2 Dust emission potential
12 STEP 6: ACCESS/CONTAINMENT SYSTEMS
12.1 Components
12.2 Reassessment of strategy
13 STEP 7: EMISSIONS MONITORING
13.1 General
13.2 Criteria for monitoring
13.3 Monitoring requirements
13.4 Review of monitoring requirements
14 STEP 8: WORKER PROTECTION REQUIREMENTS
15 STEP 9: WASTE MANAGEMENT
16 STEP 10: PROJECT CLEARANCE
17 STEP 11: PROJECT COST ESTIMATES
18 STEP 12: PROJECT SPECIFIC SPECIFICATION
19 STEP 13: HAZARDOUS PAINT COMPLIANCE PLAN
20 STEP 14: PROJECT IMPLEMENTATION
21 STEP 15: COMPLIANCE REPORT
APPENDIX A - PRESENCE AND CONCENTRATION OF HAZARDOUS PIGMENT
A1 SCOPE
A2 SITE SAMPLING STRATEGY
A3 INTERPRETATION OF RESULTS
A4 FIELD SAMPLING AND LABORATORY TESTING
A4.1 General
A4.2 Analysing for zinc chromate
A4.3 Materials and equipment
A4.4 Procedure
A4.5 Documentation
A4.6 Report
A5 PORTABLE X-RAY FLUORESCENCE (XRF)
A5.1 Principle
A5.2 Equipment
A5.3 Procedure
A5.4 Report
APPENDIX B - CONDUCTING THE RISK ASSESSMENT
B1 SCOPE
B2 GENERAL
B3 RISK ASSESSMENT PROCESS
B3.1 General
B3.2 Source/release assessment
B3.3 Exposure assessment
B3.4 Dose-response assessment
B3.5 Risk characterization
B4 PERFORMING THE SIMPLIFIED RISK ASSESSMENT
B5 PUBLIC HEALTH RISK ASSESSMENT
B5.1 Scope
B5.2 Principle
B5.3 Materials and equipment
B5.4 Assessment procedures
B6 ASSESSMENT OF HEALTH RISK TO ADJACENT WORKERS
B6.1 Scope
B6.2 Principle
B6.3 Materials and equipment
B6.4 Assessment procedure
B7 ENVIRONMENTAL RISK ASSESSMENT
B7.1 Scope
B7.2 Principle
B7.3 Assessment procedure
B8 PROJECT RISK ASSESSMENT RATING
B9 RECORDS
APPENDIX C - ASSESSMENT OF EXISTING PAINTS AND CORROSION
C1 SCOPE
C2 GENERAL
C3 MATERIALS AND EQUIPMENT
C4 SAMPLING PLAN
C5 VISUAL PAINT ASSESSMENT
C5.1 Paint integrity
C5.2 Corrosion
C6 PAINT TESTING
C6.1 Paint type
C6.2 Paint thickness testing
C6.3 Adhesion/cohesion testing
C6.4 Under-film substrate condition
C7 INTERPRETATION OF RESULTS
C7.1 Indicative results
C7.2 Paint type
C7.3 Paint integrity
C7.4 Paint adhesion
C7.5 Paint thickness
C7.6 Corrosion
C7.7 Substrate condition
C8 TEST PATCHES
C9 REPORTING
APPENDIX D - PAINT REMOVAL/SURFACE PREPARATION METHODOLOGY
D1 SCOPE
D2 RISK MANAGEMENT
D3 PAINT REMOVAL METHODS
D3.1 General
D3.2 Magnetic induction
D3.3 Chemical stripping
D3.4 Sodium bicarbonate blast cleaning
D3.5 High pressure water jetting without abrasive injection
D3.6 Ultra high pressure water jetting without abrasive injection
D3.7 Vacuum-shrouded water jetting
D3.8 Cryogenic blast medium
D4 COMBINED PAINT REMOVAL/SURFACE PREPARATION
D4.1 General
D4.2 Hand tool cleaning
D4.3 Power tool cleaning
D4.4 Power tool cleaning with vacuum shroud
D4.5 Vacuum blast cleaning
D4.6 Closed centrifugal wheel cleaning
D4.7 Wet abrasive blast cleaning or abrasive water jetting
D4.8 Dry abrasive blast cleaning
D5 DURABILITY OF MAINTENANCE PAINTING
D6 DUST/MIST EMISSION POTENTIAL
APPENDIX E - CONTAINMENT DESIGN
E1 SCOPE
E2 GENERAL
E3 CONTAINMENT SYSTEM COMPONENTS
E3.1 Description
E3.2 Containment material rigidity
E3.3 Containment material permeability/resistance
E3.4 Support structure
E3.5 Containment enclosure joints
E3.6 Containment entryways
E4 VENTILATION SYSTEM COMPONENTS
E4.1 Purpose
E4.2 Natural ventilation system
E4.3 Mechanical ventilation system
E4.4 Exhaust air filtration
E5 METHODS OF COLLECTING DEBRIS
E5.1 Handling
E5.2 Collection
E5.3 Gravity collection
E6 DESIGNING A CONTAINMENT SYSTEM
E7 VISIBLE EMISSIONS ASSESSMENT
E7.1 Principle
E7.2 Materials and equipment
E7.3 Procedure
E7.4 Interpretation of results
E7.5 Reporting/record keeping
E8 CONTAINMENT CRITERIA TABLE
E9 CONTAINMENT CLEANING/CLEARANCE PRIOR TO RELOCATION
E9.1 Cleaning procedures prior to moving (but not dismantling) containment
E9.2 Clearance criteria
APPENDIX F - AIR MONITORING FOR DUST EMISSIONS
F1 SCOPE
F2 GENERAL
F3 MONITORING PLAN
F3.1 Air monitoring plan
F3.2 Reporting
F4 AMBIENT AIR (TSP) MONITORING
F4.1 Principle
F4.2 Procedure
F4.3 Plant and equipment
F4.4 Monitor location
F4.5 Interpretation of results
F4.6 Reporting/record keeping
F5 SURFACE DUST SAMPLING
F5.1 Scope
F5.2 Materials and equipment
F5.3 Selection of sampling locations
F5.4 Sampling procedure
F5.5 Interpretation of results
F5.6 Record keeping
F6 MIST FALL-OUT MONITORING
F6.1 Scope
F6.2 Principle
F6.3 Equipment
F6.4 Sampling plan
F6.5 Sampling procedure
F6.6 Interpretation of results
F6.7 Record keeping
APPENDIX G - GROUND (SOIL) SAMPLING AND ANALYSIS
G1 SCOPE
G2 BACKGROUND
G3 MATERIALS AND EQUIPMENT
G4 SAMPLE LOCATION SELECTION
G4.1 General
G4.2 Unique land usage
G4.3 Sampling locations
G5 SAMPLE COLLECTION
G6 FREQUENCY OF SAMPLING
G7 VISUAL ASSESSMENT
G8 LABORATORY ANALYSIS
G9 INTERPRETATION OF RESULTS
G9.1 Visual assessment
G9.2 Laboratory assessment
G10 RECORD KEEPING
APPENDIX H - WATER AND UNDERWATER SEDIMENT SAMPLING ANALYSIS
H1 SCOPE
H2 GENERAL
H3 FREQUENCY OF SAMPLING
H4 MATERIALS AND EQUIPMENT
H5 NUMBER OF SAMPLES
H5.1 Sampling
H5.2 Sensitive receptors
H5.3 Variable flow water courses
H6 SAMPLE COLLECTION PROCEDURE
H6.1 Pre-cleaning and stabilizing containers for water samples
H6.2 Collection of water samples
H6.3 Precleaning and collection of underwater sediment samples
H7 LABORATORY ANALYSIS
H8 INTERPRETATION OF RESULTS
H8.1 Visual assessment
H8.2 Laboratory assessment
H9 RECORD KEEPING
APPENDIX I - WORKER PROTECTION
I1 SCOPE
I2 WORKPLACE EXPOSURES
I3 WORKPLACE EXPOSURE ASSESSMENT
I3.1 Description
I3.2 Materials and equipment
I3.3 Procedure
I3.4 Laboratory analysis
I3.5 Reporting/record keeping
I3.6 Initial monitoring
I3.7 Available data
I3.8 Scope of monitoring
I3.9 Monitoring objectives
I3.10 Increased monitoring
I3.11 Advice to workers
I3.12 Interim protective measures
I4 REQUIREMENTS FOR WORKER PROTECTION
I5 REGULATED AREA
I5.1 Purpose
I5.2 Method of establishing regulated areas
I6 HAZARDOUS PAINT COMPLIANCE PLAN
I7 RESPONSIBLE PERSON
I8 RESPIRATORY PROTECTION
I9 PROTECTIVE CLOTHING AND EQUIPMENT
I10 HOUSEKEEPING
I11 HYGIENE FACILITIES
I12 MEDICAL SURVEILLANCE
I13 WORKER INFORMATION AND TRAINING
I14 SIGNS
I15 RECORD KEEPING
APPENDIX J - SOLID WASTE MANAGEMENT
J1 SCOPE
J2 BACKGROUND INFORMATION
J3 PROJECT PLANNING
J3.1 Classification of waste
J3.2 Quantity of waste
J4 RESPONSIBILITIES
J4.1 Owner's responsibilities
J4.2 Contractor's responsibilities
J5 ON-SITE WASTE MANAGEMENT
J5.1 General
J5.2 Waste collection
J5.3 Waste labels
J5.4 Waste containers
J5.5 Site waste storage requirements
J5.6 Transport to site storage facility
J5.7 Training and contingency plan
J5.8 Manifests
J6 WASTE SAMPLING, CLASSIFICATION AND ANALYSIS
J6.1 Sampling plan
J6.2 Number of samples
J6.3 Sampling procedures
J6.4 Sample shipping and documentation
J6.5 Waste assessment
J7 HAZARDOUS WASTE DISPOSAL
J7.1 General
J7.2 Waste transportation and disposal
J8 WASTE REDUCTION
J9 DISPOSING OF NON-HAZARDOUS WASTE
J10 WASTEWATER MANAGEMENT
J11 DISPOSAL OF CONSUMABLE SUPPLIES
APPENDIX K - PROJECT CLEARANCE
K1 SCOPE
K2 GENERAL
K3 CONTAINMENT CLEANING/CLEARANCE PRIOR TO DISMANTLING
K3.1 Pre-cleaning
K3.2 Acceptance criteria
K4 CLEANING AND TESTING OF EQUIPMENT AND ADJACENT FACILITY STRUCTURES
K4.1 Scope
K4.2 Cleaning procedures
K4.3 Clearance criteria
K5 CLEANING AND CLEARANCE OF CONSUMABLE RE-USABLE SUPPLIES AND MATERIALS
K5.1 Cleaning of consumable materials
K5.2 Cleaning of re-usable materials
K5.3 Cleaning of ductwork
K5.4 Cleaning of air-handling equipment filters
K6 POST-PROJECT SAMPLING AND TESTING
K6.1 General
K6.2 Dust monitoring
K6.3 Soil samples
K6.4 Water/sediment
K7 COMPLETION OF WORK
K8 REPORTING
APPENDIX L - PROJECT IMPLEMENTATION
L1 SCOPE
L2 PRINCIPLE
L3 DESIGN PHASE
L4 HAZARDOUS PAINT COMPLIANCE PLAN
L5 PROJECT START-UP
L5.1 General
L5.2 Records
L6 DURING PROJECT
L6.1 General
L7 CLEARANCE AND COMPLETION
L8 COMPLIANCE REPORT
Keep me up-to-date
Sign up to receive updates when there are changes to this standard
References
Methods of test for paints and related materials - Exposed to weathering - Degree of cracking
Methods for sampling and analysis of ambient air - Part 9.3: Determination of suspended particulate matter - Total suspended particulate matter (TSP) - High volume sampler gravimetric method
Related Information
Similar Standards
-
AS/NZS 4361.2:2017
Guide to hazardous paint management - Part 2: Lead paint in residential, public and commercial buildings -
BS 7079:2009
General introduction to standards for preparation of steel substrates before application of paints and related products
-
BS EN 12921-1:2005+A1:2010
Machines for surface cleaning and pre-treatment of industrial items using liquids or vapours, Common safety requirements
-
BS EN 12921-2:2005+A1:2008
Machines for surface cleaning and pre-treatment of industrial items using liquids or vapours, Safety of machines using water based cleaning liquids
AS/NZS 4361.1:2017 GUIDE TO HAZARDOUS PAINT MANAGEMENT - LEAD AND OTHER HAZARDOUS METALLIC PIGMENTS IN INDUSTRIAL...
PREFACE
CONTENTS
FOREWORD
1 SCOPE
2 APPLICATION
3 REFERENCED DOCUMENTS
4 DEFINITIONS
4.1 Chain-of-custody form
4.2 Comparable area
4.3 Competent person
4.4 Compliance report
4.5 Containment system
4.6 Contractor
4.7 Discharge
4.8 Disposal
4.9 Hazardous paint
4.10 Hazardous paint compliance plan (HPCP)
4.11 Hazardous waste
4.12 HEPA vacuum
4.13 High efficiency particulate air filter
4.14 Impermeable
4.15 Industrial structure
4.16 Overcoat
4.17 Owner
4.18 PCBU
4.19 Registered medical practitioner
4.20 Regulated area
4.21 Representative sample
4.22 Responsible person
4.23 Small project
4.24 Temporary storage
4.25 Time-weighted average (TWA)
4.26 Total suspended particulate (TSP)
4.27 Toxicity characteristic leaching procedure (TCLP)
4.28 Treatment
4.29 Ventilation system
4.30 Waste Generator
4.31 Worker
4.32 Workplace exposure (to air-borne contaminants)
4.33 Workplace exposure action level
4.34 Workplace exposure standard
5 SMALL PROJECTS
6 DECISION PATH
6.1 General
6.2 Steps in the decision path
7 STEP 1: IDENTIFYING HAZARDOUS METALLIC PIGMENT
8 STEP 2: DETERMINING THE TOTAL MASS OF HAZARDOUS PAINT
9 STEP 3: RISK ASSESSMENT
10 STEP 4: MAINTENANCE PAINTING STRATEGY
10.1 Painting strategy alternatives
10.2 Paint condition assessment
10.3 Other factors
10.4 Reassessment
11 STEP 5: PAINT REMOVAL/SURFACE PREPARATION METHODOLOGY
11.1 Paint removal
11.2 Dust emission potential
12 STEP 6: ACCESS/CONTAINMENT SYSTEMS
12.1 Components
12.2 Reassessment of strategy
13 STEP 7: EMISSIONS MONITORING
13.1 General
13.2 Criteria for monitoring
13.3 Monitoring requirements
13.4 Review of monitoring requirements
14 STEP 8: WORKER PROTECTION REQUIREMENTS
15 STEP 9: WASTE MANAGEMENT
16 STEP 10: PROJECT CLEARANCE
17 STEP 11: PROJECT COST ESTIMATES
18 STEP 12: PROJECT SPECIFIC SPECIFICATION
19 STEP 13: HAZARDOUS PAINT COMPLIANCE PLAN
20 STEP 14: PROJECT IMPLEMENTATION
21 STEP 15: COMPLIANCE REPORT
APPENDIX A - PRESENCE AND CONCENTRATION OF HAZARDOUS PIGMENT
A1 SCOPE
A2 SITE SAMPLING STRATEGY
A3 INTERPRETATION OF RESULTS
A4 FIELD SAMPLING AND LABORATORY TESTING
A4.1 General
A4.2 Analysing for zinc chromate
A4.3 Materials and equipment
A4.4 Procedure
A4.5 Documentation
A4.6 Report
A5 PORTABLE X-RAY FLUORESCENCE (XRF)
A5.1 Principle
A5.2 Equipment
A5.3 Procedure
A5.4 Report
APPENDIX B - CONDUCTING THE RISK ASSESSMENT
B1 SCOPE
B2 GENERAL
B3 RISK ASSESSMENT PROCESS
B3.1 General
B3.2 Source/release assessment
B3.3 Exposure assessment
B3.4 Dose-response assessment
B3.5 Risk characterization
B4 PERFORMING THE SIMPLIFIED RISK ASSESSMENT
B5 PUBLIC HEALTH RISK ASSESSMENT
B5.1 Scope
B5.2 Principle
B5.3 Materials and equipment
B5.4 Assessment procedures
B6 ASSESSMENT OF HEALTH RISK TO ADJACENT WORKERS
B6.1 Scope
B6.2 Principle
B6.3 Materials and equipment
B6.4 Assessment procedure
B7 ENVIRONMENTAL RISK ASSESSMENT
B7.1 Scope
B7.2 Principle
B7.3 Assessment procedure
B8 PROJECT RISK ASSESSMENT RATING
B9 RECORDS
APPENDIX C - ASSESSMENT OF EXISTING PAINTS AND CORROSION
C1 SCOPE
C2 GENERAL
C3 MATERIALS AND EQUIPMENT
C4 SAMPLING PLAN
C5 VISUAL PAINT ASSESSMENT
C5.1 Paint integrity
C5.2 Corrosion
C6 PAINT TESTING
C6.1 Paint type
C6.2 Paint thickness testing
C6.3 Adhesion/cohesion testing
C6.4 Under-film substrate condition
C7 INTERPRETATION OF RESULTS
C7.1 Indicative results
C7.2 Paint type
C7.3 Paint integrity
C7.4 Paint adhesion
C7.5 Paint thickness
C7.6 Corrosion
C7.7 Substrate condition
C8 TEST PATCHES
C9 REPORTING
APPENDIX D - PAINT REMOVAL/SURFACE PREPARATION METHODOLOGY
D1 SCOPE
D2 RISK MANAGEMENT
D3 PAINT REMOVAL METHODS
D3.1 General
D3.2 Magnetic induction
D3.3 Chemical stripping
D3.4 Sodium bicarbonate blast cleaning
D3.5 High pressure water jetting without abrasive injection
D3.6 Ultra high pressure water jetting without abrasive injection
D3.7 Vacuum-shrouded water jetting
D3.8 Cryogenic blast medium
D4 COMBINED PAINT REMOVAL/SURFACE PREPARATION
D4.1 General
D4.2 Hand tool cleaning
D4.3 Power tool cleaning
D4.4 Power tool cleaning with vacuum shroud
D4.5 Vacuum blast cleaning
D4.6 Closed centrifugal wheel cleaning
D4.7 Wet abrasive blast cleaning or abrasive water jetting
D4.8 Dry abrasive blast cleaning
D5 DURABILITY OF MAINTENANCE PAINTING
D6 DUST/MIST EMISSION POTENTIAL
APPENDIX E - CONTAINMENT DESIGN
E1 SCOPE
E2 GENERAL
E3 CONTAINMENT SYSTEM COMPONENTS
E3.1 Description
E3.2 Containment material rigidity
E3.3 Containment material permeability/resistance
E3.4 Support structure
E3.5 Containment enclosure joints
E3.6 Containment entryways
E4 VENTILATION SYSTEM COMPONENTS
E4.1 Purpose
E4.2 Natural ventilation system
E4.3 Mechanical ventilation system
E4.4 Exhaust air filtration
E5 METHODS OF COLLECTING DEBRIS
E5.1 Handling
E5.2 Collection
E5.3 Gravity collection
E6 DESIGNING A CONTAINMENT SYSTEM
E7 VISIBLE EMISSIONS ASSESSMENT
E7.1 Principle
E7.2 Materials and equipment
E7.3 Procedure
E7.4 Interpretation of results
E7.5 Reporting/record keeping
E8 CONTAINMENT CRITERIA TABLE
E9 CONTAINMENT CLEANING/CLEARANCE PRIOR TO RELOCATION
E9.1 Cleaning procedures prior to moving (but not dismantling) containment
E9.2 Clearance criteria
APPENDIX F - AIR MONITORING FOR DUST EMISSIONS
F1 SCOPE
F2 GENERAL
F3 MONITORING PLAN
F3.1 Air monitoring plan
F3.2 Reporting
F4 AMBIENT AIR (TSP) MONITORING
F4.1 Principle
F4.2 Procedure
F4.3 Plant and equipment
F4.4 Monitor location
F4.5 Interpretation of results
F4.6 Reporting/record keeping
F5 SURFACE DUST SAMPLING
F5.1 Scope
F5.2 Materials and equipment
F5.3 Selection of sampling locations
F5.4 Sampling procedure
F5.5 Interpretation of results
F5.6 Record keeping
F6 MIST FALL-OUT MONITORING
F6.1 Scope
F6.2 Principle
F6.3 Equipment
F6.4 Sampling plan
F6.5 Sampling procedure
F6.6 Interpretation of results
F6.7 Record keeping
APPENDIX G - GROUND (SOIL) SAMPLING AND ANALYSIS
G1 SCOPE
G2 BACKGROUND
G3 MATERIALS AND EQUIPMENT
G4 SAMPLE LOCATION SELECTION
G4.1 General
G4.2 Unique land usage
G4.3 Sampling locations
G5 SAMPLE COLLECTION
G6 FREQUENCY OF SAMPLING
G7 VISUAL ASSESSMENT
G8 LABORATORY ANALYSIS
G9 INTERPRETATION OF RESULTS
G9.1 Visual assessment
G9.2 Laboratory assessment
G10 RECORD KEEPING
APPENDIX H - WATER AND UNDERWATER SEDIMENT SAMPLING ANALYSIS
H1 SCOPE
H2 GENERAL
H3 FREQUENCY OF SAMPLING
H4 MATERIALS AND EQUIPMENT
H5 NUMBER OF SAMPLES
H5.1 Sampling
H5.2 Sensitive receptors
H5.3 Variable flow water courses
H6 SAMPLE COLLECTION PROCEDURE
H6.1 Pre-cleaning and stabilizing containers for water samples
H6.2 Collection of water samples
H6.3 Precleaning and collection of underwater sediment samples
H7 LABORATORY ANALYSIS
H8 INTERPRETATION OF RESULTS
H8.1 Visual assessment
H8.2 Laboratory assessment
H9 RECORD KEEPING
APPENDIX I - WORKER PROTECTION
I1 SCOPE
I2 WORKPLACE EXPOSURES
I3 WORKPLACE EXPOSURE ASSESSMENT
I3.1 Description
I3.2 Materials and equipment
I3.3 Procedure
I3.4 Laboratory analysis
I3.5 Reporting/record keeping
I3.6 Initial monitoring
I3.7 Available data
I3.8 Scope of monitoring
I3.9 Monitoring objectives
I3.10 Increased monitoring
I3.11 Advice to workers
I3.12 Interim protective measures
I4 REQUIREMENTS FOR WORKER PROTECTION
I5 REGULATED AREA
I5.1 Purpose
I5.2 Method of establishing regulated areas
I6 HAZARDOUS PAINT COMPLIANCE PLAN
I7 RESPONSIBLE PERSON
I8 RESPIRATORY PROTECTION
I9 PROTECTIVE CLOTHING AND EQUIPMENT
I10 HOUSEKEEPING
I11 HYGIENE FACILITIES
I12 MEDICAL SURVEILLANCE
I13 WORKER INFORMATION AND TRAINING
I14 SIGNS
I15 RECORD KEEPING
APPENDIX J - SOLID WASTE MANAGEMENT
J1 SCOPE
J2 BACKGROUND INFORMATION
J3 PROJECT PLANNING
J3.1 Classification of waste
J3.2 Quantity of waste
J4 RESPONSIBILITIES
J4.1 Owner's responsibilities
J4.2 Contractor's responsibilities
J5 ON-SITE WASTE MANAGEMENT
J5.1 General
J5.2 Waste collection
J5.3 Waste labels
J5.4 Waste containers
J5.5 Site waste storage requirements
J5.6 Transport to site storage facility
J5.7 Training and contingency plan
J5.8 Manifests
J6 WASTE SAMPLING, CLASSIFICATION AND ANALYSIS
J6.1 Sampling plan
J6.2 Number of samples
J6.3 Sampling procedures
J6.4 Sample shipping and documentation
J6.5 Waste assessment
J7 HAZARDOUS WASTE DISPOSAL
J7.1 General
J7.2 Waste transportation and disposal
J8 WASTE REDUCTION
J9 DISPOSING OF NON-HAZARDOUS WASTE
J10 WASTEWATER MANAGEMENT
J11 DISPOSAL OF CONSUMABLE SUPPLIES
APPENDIX K - PROJECT CLEARANCE
K1 SCOPE
K2 GENERAL
K3 CONTAINMENT CLEANING/CLEARANCE PRIOR TO DISMANTLING
K3.1 Pre-cleaning
K3.2 Acceptance criteria
K4 CLEANING AND TESTING OF EQUIPMENT AND ADJACENT FACILITY STRUCTURES
K4.1 Scope
K4.2 Cleaning procedures
K4.3 Clearance criteria
K5 CLEANING AND CLEARANCE OF CONSUMABLE RE-USABLE SUPPLIES AND MATERIALS
K5.1 Cleaning of consumable materials
K5.2 Cleaning of re-usable materials
K5.3 Cleaning of ductwork
K5.4 Cleaning of air-handling equipment filters
K6 POST-PROJECT SAMPLING AND TESTING
K6.1 General
K6.2 Dust monitoring
K6.3 Soil samples
K6.4 Water/sediment
K7 COMPLETION OF WORK
K8 REPORTING
APPENDIX L - PROJECT IMPLEMENTATION
L1 SCOPE
L2 PRINCIPLE
L3 DESIGN PHASE
L4 HAZARDOUS PAINT COMPLIANCE PLAN
L5 PROJECT START-UP
L5.1 General
L5.2 Records
L6 DURING PROJECT
L6.1 General
L7 CLEARANCE AND COMPLETION